How you will prepare the thrust block during survey?
Preparation
before survey
–
Ensure the following paper work is to
have –
a)
Copies
of previous survey report.
b)
Hours
running from last survey.
c)
Copies
of planned maintenance report.
d)
Record
of clearances
e)
Manufacturers
recommended tolerances.
f)
Spare
parts are available onboard.
g)
Certified
tools available onboard.
Dismantling
procedure:
a)
Take
out bearing casing.
b)
Take
out oil spreader and dismantle stopper pipe.
c)
Fit
long eye bolt in pad with shackle.
d)
Pad
lift out from housing.
e)
Pad
housing is turned out from casing and lifted out.
f)
Remove
screw on back plate.
g)
All
dismantled parts cleaned for surveyor inspection.
No comments